Case Study

The Golf League “Greenzone” at SoFi Center

Project
Overview

Scott System helped bring one of golf’s most innovative new experiences to life with TGL, the high-tech league by Tiger Woods and Rory McIlroy at SoFi Center’s 1,500-seat arena.

Scott System was tasked with fabricating the undulating geofoam for the 3,800-square-foot turntable green, known as the “Greenzone.” The green rotates 360 degrees and uses 600 actuators to dynamically adjust slopes for each hole. The project required translating its complex digital topography into precisely fabricated EPS components ready for installation.

The Challenges

The Greenzone’s highly specialized geometry required a level of precision beyond conventional foam fabrication. Complex CAD models had to be divided into manageable components without compromising the overall topography. Each piece also needed to align accurately with the larger assembly to support an efficient installation on site.


Want to Learn More About The Challenges?

Contact Us

The Vision

The Greenzone was designed as a dynamic playing surface capable of changing its slopes for each hole.


Its 360-degree rotating platform and 600 actuators allow the green to create different playing conditions within the arena, requiring an equally customized approach to the underlying geofoam.

Proposed Solution

Scott System used advanced 5-axis CNC machining to shape EPS foam blocks according to the Greenzone’s custom topography.

The team segmented CAD models into manageable components and used CAM software to develop layouts and verified toolpaths for machining. After fabrication, tolerance checks and dry fittings confirmed alignment before installation on site.


Want to Learn More About Our Solutions?

Contact Us

Components for Success

  • 5-Axis CNC Machining: Precisely shaped EPS to match the Greenzone’s complex topography.
  • CAD Segmentation: Converted the digital model into manageable components for fabrication.
  • CAM Programming: Generated and verified toolpaths for accurate machining.
  • Dry-Fit Verification: Confirmed component alignment before on-site installation.

Products Used

Custom EPS Geofoam: Fabricated for the 3,800-square-foot Greenzone

5-Axis CNC Milling: Used to create its complex, undulating geometry


Want to Learn More About Our Products?

Contact Us

The Outcome

Scott System transformed the Greenzone’s complex digital topography into precisely machined EPS components ready for integration into the rotating playing surface. Pre-installation tolerance checks and dry fitting helped ensure accurate alignment and a smooth transition from fabrication to field installation.